1 Surfaces to Plaster
2 Plaster Thickness & Specifications
Instant Results & Bill of Quantities
Total Plaster Cement Bags
0 كيس 50كجم
0.0 tons Portland cement
Washed Sand Required
0.0 م³
Approx. 0 tons washed sand
Fiber Mesh Corner Rolls
0 لفة (50م)
Concrete-Block Joint Mesh
Breakdown for Spatterdash & Plaster Coats:
| Layer / Coat | Cement (Bags) | Sand (m³) | Mixing Water (L) |
|---|
Result type: Material Consumption Estimate
Formulas & Assumptions
Formulas used
V_wet = A × t × (1 + Waste)Wet mortar volumeV_dry ≈ V_wet × 1.30Approximate dry volume after sand bulkingCement = V × bags/m³Cement bags requiredSand = V × 1.1 (m³)Sand volume
Assumptions & reference values
- Editable assumptionWet→dry volume factor ≈ 1.30 depending on sand bulking.
- Default valueDefault render mix 1:4, spatterdash 1:2 — editable.
- Industry estimate≈ 7 cement bags per m³ of 1:3 mortar.
Notices: This result is intended for quantity estimation. Verify quantities against approved drawings and project specifications before procurement or construction.
This calculator provides quantity and preliminary cost estimation. Structural design, material specifications and final quantities must be verified against project drawings, specifications and applicable engineering standards.